On July 9, 2024, the Texas General Land Office (GLO) adopted emergency rules to enable coastal counties and municipalities affected by Tropical Storm Alberto and Hurricane Beryl to expedite the beachfront construction and dune protection permitting process. Specifically, 31 Texas Administrative Code §15.18 (Emergency Dune Restoration, Stabilization and Repair of Damaged Habitable Structures, and Repair and Shortening of Dune Walkovers) allowed the authorization of dune restoration, emergency stabilization and repair of habitable structures, and emergency repairs and shortening of dune walkovers following a storm.
As a courtesy, we are providing notification that the ability of local governments to authorize actions under the emergency rules will expire on November 7, 2024. Any emergency authorizations proposed after the expiration date will be required to adhere to the standard permitting process as outlined in your local Beach Access and Dune Protection Plans and state Beach/Dune rules. Emergency authorizations issued prior to November 7, 2024 are valid for 6- months from the date of issuance.
Under the emergency rules, local governments were required to maintain a written record of any authorizations issued under 31 TAC § 15.18. A copy of the complete written record of all actions authorized under the emergency rules must be submitted to the GLO no later than November 14, 2024. The GLO will provide each local government with a link to a box.com folder where the written records can be uploaded if there are file size constraints.
For emergency repairs to damaged habitable structures, dune restoration projects, or repair or shortening of a dune walkover, the written record must include a record of the names and addresses of the property owners that received such authorization. For each authorization, the local government must provide to the GLO a written record of the actions that it authorized, including the address and location of the structure, dune restoration or dune walkover, a description of the repairs or other activities, and pictures of the structure, dune restoration, or dune walkover before and after completion of the authorized activities.


